background image

11

Wegaconcept

User manual

ENGLISH

6

 Preparation 

6.1 

Preparation of the machine 

The preparation of the machine and the instal-

lation operations must be carried out by qualifi ed 
personnel only.

The installer must strictly follow the indications 

provided in  chap. 5 "Warnings for the Installer".

6.2 

Grinding and dosing coff ee 

Place the grinder-doser in a convenient place 

near the machine.

Grinding and dosing of coff ee must take place 

in accordance with the instructions of the manu-
facturer of the grinder-doser. 

To obtain good quality espresso coff ee we sug-

gest the following:

not to store large amounts of coff ee beans. to 

• 

observe (in any case) the expiry date indicated 
by the producer.

to grind an amount of coff ee based on use, pre-

• 

pare the amount contained in the doser and if 
possible use it before the end of the day;

never to buy (if possible) already ground coff ee, 

• 

as it expires quickly. if necessary, to buy it in small 
vacuum-sealed packages.

to fill the filter with a dose of ground coffee 

(about 6-7 gr.) and press it with the special coff ee 
presser. Hook the portafi lter to the delivery group.

release the whole volume of hot water inside 

2. 

the boiler (8 liters for 2GR, 13 liters for 3GR and 
4GR), by performing a continuous delivery from 
the appropriate nozzle. In the case of several 
dispensing points, divide the volume on the 
base of the number of the dispensing points;

continuously release steam for at least 1 minute 

3. 

for each steam dispensing point;

When installation is complete, the installer must 

write a report about the performed operations.

5.5 

Maintenance and repairs

After ta maintenance and/or repair intervention, 

the components used must ensure that the hygiene 
and safety requirements initially foreseen for the ap-
pliance are still met. These are met by using original 
spare parts only. 

After a repair or a substitution of components 

related to parts in direct contact with water and 
food, a washing procedure has to be carried out, as 
in the case of fi rst installation.

!

Using the machine without all the installation 
operations having been carried out by technical 
personnel could damage it seriously.

!

To prevent the seal from wearing too soon, 
clean the edge of the fi lter before engaging 
the portafi lter on the delivery group. Do not 
excessively tighten the portafi lter to the dis-
pensing group.

Содержание WegaConcept 2Gr

Страница 1: ...ESPRESSO COFFEE MACHINE Instruction Manual for USER english...

Страница 2: ......

Страница 3: ...rkl rung bezieht gem den folgenden EG Vorschriften gebaut ist EG VORSCHRIFTEN waar deze verklaring betrekking op heeft overeenstemt met de vereisten van de volgende EG RICHTLIJNEN referida nesta decla...

Страница 4: ...English...

Страница 5: ...e 7 1 5 Typographical conventions 7 2 Presentation 8 3 Technical data 8 4 Description of the machine 9 4 1 Description 9 4 2 Push button panel for coffee selections 10 4 3 Display and browser key 10 4...

Страница 6: ...stallation may be harmful to people property or animals This appliance is completely safe only if it is con nectedtoaneffectivegroundingsystem execut ed as required by current safety standards The ele...

Страница 7: ...the safety devices done by qualified personnel Do not expose your hands or other body parts to the coffee steam or hot water spouts The steam and water that come from the spouts can cause burns When...

Страница 8: ...n 800 31 5 1040 40 9 1280 50 4 Depth mm in 580 22 8 580 22 8 580 22 8 Height mm in 590 23 2 590 23 2 590 23 2 Net weight kg lb 95 209 117 257 142 312 Operating conditions C F 5 40 41 104 2 Presentatio...

Страница 9: ...burn rubber 6 Steam nozzle 7 Tray and cup support grille 8 Pull out cup support grille 9 Illuminated side 10 Portafilter 11 Hot water delivery nozzle 12 Steam delivery nozzle autosteamer 13 Adjustable...

Страница 10: ...When installation is complete the appliance has to be started brought to the nominal working condition and left for 30 minutes in the ready to operate condition Afterwards the appliance has to be turn...

Страница 11: ...coffee presser Hook the portafilter to the delivery group release the whole volume of hot water inside 2 the boiler 8 liters for 2GR 13 liters for 3GR and 4GR byperformingacontinuousdeliveryfrom the...

Страница 12: ...timethe machine is turned on the solenoid valves of the groups will be activated making water and steam come out from the perforated disk of each group for about 10 seconds When the heating phase of t...

Страница 13: ...OFF ON 4 OFF OFF 8 Preliminary operations 8 1 Changing the water In case of breaks longer than 1 week it is neces sary to perform the changing of the 100 of the water contained in the hydraulic circui...

Страница 14: ...esso wait for delivery to confirm the desired dose press again the dosekeyorthe PROG STOP key once the dose is confirmed the LED of the pro grammed key switches off and only the keys yet to be set rem...

Страница 15: ...y turning it horizontally the steam coming out of the nozzle 7 will be proportional to the opening of the tap If the knob is released it will return to the closed position stopping the dispensing By m...

Страница 16: ...am LEAVE THE STEAM NOZZLE IMMERGED IN THE MILK ONLY FOR THE TIME REQUIRED FOR HEAT ING DO NOT OPEN THE STEAM TAP WITH THE STEAM NOZZLE IMMERGED IN MILK WHILE THE MACHINE IS OFF Toobtainanoptimalfoamin...

Страница 17: ...teamer 13 into the beverage press the key wait until the dispensing is finished once the dispensing has finished the milk will be heated to the programmed temperature but not foamed To stop dispensing...

Страница 18: ...the energy saving mode for the machine or of the standby mode for the dispensing groups expires The system will continue to follow the pro grammed energy saving settings All the groups are in standby...

Страница 19: ...lowing 13 Datareadingandprogramming 13 1 Main menu To access the reading of machine data and the programming of the main parameters hold down the ENTER key of the navigator key for at least 5 seconds...

Страница 20: ...In case of inactivity of the operator after 10 seconds the display will return to the main menu i The machine comes out of the factory with a pressure value of 1 2 Bar which allows an op timaluseofth...

Страница 21: ...perature adjustment Thismenuallowstheusertoadjusttheoperating temperature of the cup heater or switch it off Scroll through the menu until the item 3 CUP HEATER TEMP is highlighted The value of the te...

Страница 22: ...y screwing the knob A down securely and move the lever B back from right to left let the salt water drain from the small tube D until the water is no longer salty about 30 60 minutes The salt allows t...

Страница 23: ...mmerging the suc tion tube in water and run a delivery for a few seconds turn the rotating body X 90 to position B clo sure of milk outlet duct holding the milk suction tube in the air dispense steam...

Страница 24: ...ter from delivery group 1 and press the PROG STOP key waitfortherinsecycletobecarriedout thistakes roughly30seconds andthefollowingmessages will appear on the display at the end of the rinse cycle the...

Страница 25: ...X 16 2 Cleaning For perfect hygiene and efficiency of the unit a few simple cleaning tasks are required The indications given here are applicable for normal use of the coffee machine If the machine is...

Страница 26: ...of coffee beans Never grind large amounts of coffee Use the amount the doser holds and if possible use it by the end of the day Never purchase ground coffee as it expires quickly After themachinehasno...

Страница 27: ...ot carry out any operation on the appliance and never remove any panel of the body In case of breakdowns or poor functioning turn the appliance off disable the electric and hydraulic power supply usin...

Страница 28: ...GROUP WASHING The group washing needs to be carried out as indicated in paragraph 15 ENERGY SAVING All the groups are in stand by or the entire machine in cluding the services boiler is in energy sav...

Страница 29: ......

Страница 30: ......

Страница 31: ......

Страница 32: ...WEGA s r l Via Condotti Bardini 1 31058 SUSEGANA TV ITALY Tel 39 0438 1884811 Fax 39 0438 1884890 www wega it info wega it Cod WY02000222 Rev 00 02 2011...

Отзывы: