WeCo Srl Italia
www.wecobatteries.com
4K4 PRO V 1.11 28-9-2021
MAKE SURE THAT THERE IS
ZERO VOLTAGE ON THE BATTERY TERMINALS
. CHECK THE LED BUTTON ON THE BOTTOM AND
ALWAYS MEASURE THE B+ AND B- TERMINALS WITH A MULTIMETER.
Once it has been verified that there are ZERO volts present ON ALL BATTERIES, proceed with the installation of the cables as
shown in the diagram below.
Power Connection by using the STACKABLE KIT BUS BAR * EXAMPLE ( ONE CLUSTER COMPOSED BY 2 TOWERS 4+4)
After all cables and bus bars have been connected, and the inverter is correctly set up, try to start up the system by turning ON the master
module and proceed toward the last module installed. If the installation is properly set up all the modules will turn on in sequence, install
the protective front plate
Installing the Front Plates to protect the front connection hub
NEGATIVE TO INVERTER
POSITIVE TO INVERTER