5.3.2 Floor Stack Installation
5.3.2.1 Installation of accessories and preparatory phases
Phase 1: Choose the support surface carefully, the batteries have a weight of over 55 kg each and can reach 270 kg including the
accessories, in a stack of five batteries.
Make sure the support surface is adequate to support the overall battery load.
Preparation of the modules
The battery is delivered as standard in a
WALL MOUNTED CONFIGURATION
and it is therefore necessary that the installer make
simple external changes to install into a
STACKABLE CONFIGURATION
STACK MOUNT INSTALLATION PROCEDURE
Step 1: When the batteries will be stacked, you must remove the three brackets from the back side of the battery as shown
below