6
Please Do Not Return This Product To The Store.
Contact your local Wayne-Dalton dealer. To find your local Wayne-Dalton dealer, refer to your
local yellow pages/business listings or go to the
Find a Dealer
section online at
www.wayne-dalton.com
Tools Needed:
Preparing the opening
WEATHER SEAL
HEADROOM
bACkROOM
DOOR
WIDTH
DOOR HEIGHT
LEVEL HEADER
PLUMb jAMbS
HEADER bOARD
2” X 6” LUMbER
PREfERRED
SUITAbLE MOUNTING
SURfACE 2” X 6”
LUMbER MINIMUM
P1
Recommended
tools from
page 5
HEADER
jAMb
jAMb
heaDRoom
RequiRemeNT
DooR
heighT
TRack
maNual
liFT
moToR
oPeRaTeD
6’5”
10”, 12”, 14” Radius
89”
125”
6’5”
Low Headroom
101”
125”
6’6”
10”, 12”, 14” Radius
90”
125”
6’6”
Low Headroom
102”
125”
7’0”
10”, 12”, 14” Radius
96”
125”
7’0”
Low Headroom
108”
125”
7’6”
10”, 12”, 14” Radius
102”
137”
7’6”
Low Headroom
114”
137”
8’0”
10”, 12”, 14” Radius
108”
137”
8’0”
Low Headroom
120”
137”
backRoom RequiRemeNT
TRack
TyPe
ToRquemaSTeR
®
PluS
10”, 12”
10”
14”
12”
LHR kit
6 1/2”
fAILURE TO
SECURELY ATTACH A
SUITAbLE MOUNTING PAD TO STRUCTURALLY
SOUND fRAMING COULD CAUSE SPRINGS TO
VIOLENTLY PULL MOUNTING PAD fROM WALL,
RESULTING IN SEVERE OR fATAL INjURY.
If you just removed your existing door or you are installing a new
door, complete all steps in PREPARING THE OPENING.
To ensure secure mounting of track brackets, side and center
brackets, or steel angles to new or retro-fit construction, it is
recommended to follow the procedures outlined in DASMA Technical
Data Sheets #156, #161 and #164 at www.dasma.com.
The inside perimeter of your garage door opening should be framed
with wood jamb and header material. The jambs and header must
be securely fastened to sound framing members. It is recommended
that 2” x 6” lumber be used. The jambs must be plumb and the
header level. The jambs should extend a minimum of 12” (305 mm)
above the top of the opening for TorqueMaster
®
Plus counterbalance
systems. for low headroom applications, the jambs should extend
to the ceiling height. Minimum side clearance required, from the
opening to the wall, is 3-1/2” (89 mm).
imPoRTaNT:
Closely inspect jambs, header and mounting surface.
Any wood found not to be sound, must be replaced.
for TorqueMaster
®
Plus counterbalance systems, a suitable
mounting surface (2” x 4”) must be firmly attached to the wall,
above the header at the center of the opening.
NoTe:
Drill a 3/16” pilot hole in the mounting surface to avoid
splitting the lumber. Do not attach the mounting surface with nails.
weather Seal (may Not be included):
Cut or trim the weather seal (if necessary) to the header and jambs.
For quick install track:
Align the header seal with the inside edge
of the header and temporarily secure it to the header with equally
spaced nails. Next, fit the jamb seals up tight against the header
seal and flush with the inside edge of the jamb. Temporarily secure
the jamb seals with equally spaced nails. This will keep the bottom
section from falling out of the opening during installation. Space
nails approximately 12” apart.
NoTe:
Do not permanently attach weather seal to the jamb at this
time.
heaDRoom RequiRemeNT:
Headroom is defined as the space
needed above the top of the door for tracks, springs, etc. to allow the
door to open properly. If the door is to be motor operated, 2-1/2” (64
mm) of additional headroom is required.
NoTe:
6” LHR Conversion kit is available for 12” Radius only.
Contact your local Wayne-Dalton dealer.
backRoom RequiRemeNT:
backroom is defined as the distance
needed from the opening back into the garage to allow the door to
open fully.
waRNiNg
jAMb
WEATHER
SEAL