background image

6

A. FLAG ANGLES (AS REQUIRED):

A1. Quick Install (Q.I.) Flag Angles
A2. Fully Adjustable (F.A.) Flag Angles

B. JAMB BRACKETS (AS REQUIRED):

B1. Quick Install (Q.I.) Jamb Brackets
B2. Fully Adjustable (F.A.) Jamb Brackets
B3. Windload Jamb Brackets

C. TRACK ROLLERS (AS REQUIRED):

C1. Short Stem Track Rollers
C2. Long Stem Track Rollers

D. GRADUATED END HINGES (AS REQUIRED):

D1. Single Graduated End Hinges (S.E.H.), Industry Standard
D2. Double Graduated End Hinges (D.E.H.), Industry Standard

E. STACKED SECTIONS:

E1. Top Section
E2. Intermediate(s) Section
E3. Lock Section
E4. Bottom Section

F. TOP FIXTURES (AS REQUIRED):

F1. Top Fixture Assemblies

G. STRUT(S) (AS REQUIRED):

G1. Strut (U - shaped)

H. DRAWBAR OPERATOR BRACKET (FOR TROLLEY OPERATED DOORS):

H1. Drawbar Operator Bracket (Supplied By Others)

I. TRACKS (AS REQUIRED):

I1. Left Hand And Right Hand Horizontal Track Assemblies
I2. Left Hand And Right Hand Vertical Tracks
I3. Left Hand And Right Hand Riveted Vertical Track Assemblies
I4. Left Hand and Right Hand Angle Mount Vertical Track Assemblies

J. TORSION SPRING ASSEMBLY (AS REQUIRED):

J1. Left Hand and Right Hand Torsion Springs (As Required)
J2. Counterbalance Lift Cables
J3. Left Hand and Right Hand End Bearing Brackets (As Required)
J4. Left Hand and Right Hand Cable Drums
J5. Center Bracket (As Required)
J6. Center Bracket Bearing (As Required)
J7. Torsion Shaft / Torsion Keyed Shaft (As Required)
J8. Torsion Keyed Shafts (As Required)
J9. Keys (As Required)
J10. Center Coupler Assembly (As Required)

K. REAR BACK HANGS:

K1. Left Hand And Right Hand Rear Back Hang Assemblies

L. BOTTOM CORNER BRACKETS (AS REQUIRED):

L1. Left Hand And Right Hand Bottom Corner Brackets
L2. Left Hand And Right Hand Extension Brackets

M. BOTTOM CORNER BRACKET TRACK ROLLER CARRIERS (AS REQUIRED):

M1. Left Hand And Right Hand Bottom Corner Bracket Track Roller Carriers

A1.

A2.

B1.

B2.

B1.

B2.

C1.

C1.

E4.

E1.

E2.

E3.

F1.

G1.

I2.

I1.

I1.

K1.

K1.

NOTE: 

The illustrations shown on this page are general 

representations of the door parts. Each specific door 
models may have unique variations. 

A2.

A1.

I4.

F1.

L1.

L1.

C1.

C2.

D1.

D2.

H1.

B3

B3.

L2.

L2.

J5.

J1.

J4.

J1.

J7.

J3.

J3.

J10.

J9.

J8.

J8.

J5.

J6.

J6.

J4.

J9.

J9.

J9.

J5.

J6.

J5.

J6.

B1. (Quick 

Install 

Feature)

3rd hole 

set

Top of vertical 

track

2nd 

hole set

1st hole 

set

Middle 

hole

Bottom 

hole

Top 

hole

Lower hole 

of hole/ 

slot pattern

3rd 

hole set

Top of vertical 

track

B2. (Fully 

Adjustable 

Feature)

2nd 

hole set

1st 

hole set

B3. 

(Windload 

Jamb 

Bracket)

B3. 

(Windload 

Jamb 

Bracket)

J2.

J2.

M1.

M1.

I2.

I4.

I3.

I3.

BREAKDOWN OF PARTS

Содержание 8100

Страница 1: ...tion Instructions 7 Counterbalance Installation Instructions 13 Optional Installation 19 Inside Lock 19 Pull Down Rope 19 Maintenance 20 Cleaning Your Garage Door 20 Painting Your Garage Door 20 Maint...

Страница 2: ...AL FASTENERS IF THE ORIGINAL FASTENER WAS RED HEAD THE REPLACEMENT FASTENER MUST BE RED HEAD ALSO CONTACT WAYNE DALTON FOR FASTENER STRENGTH VALUES IF NEEDED WARNING IMPACT GUNS ARE NOT RECOMMENDED WH...

Страница 3: ...12 15 Radius 126 3200 mm 168 4267 mm 9 1 to 10 0 12 15 Radius 138 3505 mm 168 4267 mm 10 1 to 12 0 12 15 Radius 162 4115 mm See NOTE 12 1 to 14 0 12 15 Radius 186 4724 mm See NOTE HEADROOM REQUIREMENT...

Страница 4: ...Section Identification Door Height Section Type Bottom Lock sec ond Intermediate s Top I third II fourth III fifth IV sixth V sev enth 6 0 18 18 18 N A 18 6 3 21 18 18 18 6 6 21 18 18 21 6 9 21 21 21...

Страница 5: ...view illustration Bottom section Bottom weather seal Bottom corner bracket warning labels Warning label Intermediate I section Tools Required Power drill Socket driver 7 16 Level Drill bits 1 8 3 16 9...

Страница 6: ...ft Cables J3 Left Hand and Right Hand End Bearing Brackets As Required J4 Left Hand and Right Hand Cable Drums J5 Center Bracket As Required J6 Center Bracket Bearing As Required J7 Torsion Shaft Tors...

Страница 7: ...et using 1 1 4 20 x 9 16 track bolt and 1 1 4 20 flange hex nut Place the center jamb bracket over the lower hole of the hole slot pattern that is centered between the bottom jamb bracket and flag ang...

Страница 8: ...corner bracket Secure the track roller carrier to the bottom corner bracket using 1 4 20 x 7 8 self drilling screws as shown Repeat for the other track roller carrier and repeat the same process for t...

Страница 9: ...OLLER GOES INTO HINGE TUBE FURTHEST AWAY FROM SECTION IMPORTANT ONCE THE 1 4 14 X 5 8 SELF TAPPING SCREWS ARE SNUG AGAINST THE LOWER HINGE LEAF TIGHTEN AN ADDITIONAL 1 4 TO 1 2 TURN TO RECEIVE MAXIMUM...

Страница 10: ...screws Inner end stiles Step Plate 8 NOTE Depending on your door you may have two different kinds of Step Plates or two of the same kind of Step Plates Refer to Package Contents to determine which St...

Страница 11: ...the bottom section remove the nail Position the left hand vertical track assembly over the track rollers of the bottom section and install as shown Drill 3 16 pilot holes into the door jamb for the la...

Страница 12: ...TO 3 1 2 89 MM FOR SMOOTH SAFE DOOR OPERA TION FOR QUICK INSTALL TRACK Complete the vertical track installation by securing the jamb bracket s and tightening the other lag screws Repeat for other sid...

Страница 13: ...hnuts are required to be installed onto the shaft of track roller stems IMPORTANT ACCURATELY POSITIONING THE PUSHNUT ONTO THE ROLLER STEM IS CRITI CAL ONCE THE PUSHNUT IS PUSHED ONTO THE ROLLER STEM T...

Страница 14: ...location Center bracket bushing assembly 5 16 x 1 5 8 Hex head lag screw RED HEAD or 5 16 x 2 1 2 Hex head lag screw RED HEAD Vertical line Mounting surface 3 Minimum Horizontal line Vertical line Mo...

Страница 15: ...TER BRACKET BEARINGS TORSION SPRINGS CABLE DRUMS MUST BE POSITIONED AS SHOWN Slide the flat edge of the couple half flush with the side edge of the torsion keyed shaft Insert 1 key into the slot of bo...

Страница 16: ...cable drum IMPORTANT VERIFY THAT THERE ARE NO OBSTRUCTIONS IN THE TRAVEL PATH OF THE DOOR SECTIONS OR COUNTERBALANCE LIFT CABLES NOTE Always assemble the left hand cable and cable drum first to help...

Страница 17: ...NG CONE ONCE SET SCREWS CONTACT THE SHAFT TIGHTEN SCREWS ONE FULL TURN HIGH SPRING TENSION CAN CAUSE SERIOUS INJURY OR DEATH DO NOT adjust repair or remove springs or parts to which springs are connec...

Страница 18: ...s stated may be necessary If door rises off floor more than 2 ft under spring tension alone reduce spring tension If the door is hard to rise or drifts down on its own add spring tension A poorly bala...

Страница 19: ...LLED ON THIS DOOR 4 1 4 20 x 11 16 Self drilling screws Square hole in vertical track Second section Side lock End stile 1 8 Pull Down Rope WARNING DO NOT INSTALL PULL DOWN ROPE ON DOORS WITH OPERATOR...

Страница 20: ...e drawbar operator must be according to manufacturer s instructions and force settings must be adjusted properly Refer to the owner s manual supplied with your drawbar operator for complete details on...

Страница 21: ...uctions DO NOT remove cover or paint over this tag Prod uct user should inspect this tag periodically for legibility and should order a replacement tag from the door manufacturer as needed Copyright 2...

Страница 22: ...ssary maintenance normal wear and tear acts of God or any other cause beyond the reasonable control of Seller or as a result of having been exposed to toxic or abrasive environments including blowing...

Страница 23: ......

Страница 24: ...rvice representative They will be happy to handle any questions that you may have Thank you for your purchase PLEASE DO NOT RETURN THIS PRODUCT TO THE STORE After installation is complete leave this I...

Отзывы: