MiniPEK
02BI01_ee
WAVIN-LABKO OY
9(12)
6
MAINTENANCE JOURNAL TEMPLATE
Date
Operation
Performed by
5 June 14
Separator installed
A. Joe
12 October 14
Sludge and oil amount checked
Separator cleaned
A. Joe / E.
Emptier
4 May 15
Sludge and oil amount checked
Separator cleaned
A. Joe / E.
Emptier