
MiniPEK
02BI01_ee
WAVIN-LABKO OY
6(12)
Next, open the inlet fitting if it is to be used.
After positioning, support the trap so that it stays in place during casting.
Continue the groundwork on site in accordance with the site
designer’s instructions, including the
installation of HVAC pipes, soil densification, sealing and concrete reinforcement.