
MiniPEK
02BI01_ee
WAVIN-LABKO OY
5(12)
3
INSTALLATION INSTRUCTIONS
Perform trap groundwork in accordance with the site designer’s instructions. Please perform the
sealing carefully.
Position the trap into place onto the correct elevation measured from the upper surface of the
covers, as specified in the plan.
The trap may be installed deeper than the standard depth, if necessary. Cut the trap according
to the image (saw between the lines), add the smooth D315 pipe as an elevation piece, and add
mass sealer to the top and bottom ends.
Cut place between the lines