Broadband Analyzer/Generator
ANT-20/ANT-20E
TB-12
Technical Background
Time sequence
After the measurement is started (Application Manager) the following automatic sequence
begins. The sequence is split into 4 phases:
Fig. TB-7
Time sequence at ATM traffic generation, “Calling” mode (only one channel)
Phases
1. The measurement is started:
The layer 2 signaling (SSCOP) connection is set up.
2. The test channel is switched.
3. Test traffic is generated if it has been enabled.
QoS parameters are measured
4. The measurement is stopped. The test channel is cleared down; if required, the QoS
parameters are recorded in the log file.
Fig. TB-8
Displaying of results (VI “ATM Test Results”)
Signaling
traffic
SSCOP
connection
Phase
1
2
3
4
Test channel
Test traffic
Results display
Signaling
conditions
NCS
QoS parameter
connecting
connected
disconnected
disc.
connecting
connected
disconnected
disconnected
disconnected
connecting
connected
disconnected
1) VI “ATM Test Results”
2) Not Connected Seconds
1
2
Gate time
t
“Quality of Service”
parameters
Signaling
informations
Содержание ANT-20
Страница 8: ...Broadband Analyzer Generator ANT 20 ANT 20E vi Notes ...
Страница 64: ...Broadband Analyzer Generator ANT 20 ANT 20E O 46 Operation Notes ...
Страница 110: ...Broadband Analyzer Generator ANT 20 ANT 20E TB 16 Technical Background Notes ...
Страница 126: ...Broadband Analyzer Generator ANT 20 ANT 20E iv Notes ...