LOAD
GRID SUPPLY
NEUTRAL
kWh
METER
MAIN SWITCH
R-COIL
SHEILD
CT 3
_
+
K L
CT 2
_
+
K L
CT 1
_
+
K L
N 3
2
1
+
-
+
-
+
-
3
2
1
Auditor
L1
L2
L3
3. Use the onboarding tool
Place R-coil connected to ... On cables connected to ...
1+
P1
2+
P2
3+
P3
The onboarding tool at
onboarding.wattwatchers.com.au
collects the installation
details for each site including device serial number, circuit names and R-Coil size.
Log into the onboarding tool and work through the steps to configure your devices
for the installation site.
When monitoring solar inverters:
Reverse the R-coil direction so
that the arrow is from the inverter.