LOAD
GRID SUPPLY
NEUTRAL
kWh
METER
MAIN SWITCH
R-COIL
SHEILDS
CT 3
_
+
K L
CT 2
_
+
K L
CT 1
_
+
K L
N 3
2
1
+
-
+
-
+
-
3
2
1
Auditor
L1
L2
L3
Auditor 3R connection
Supply
3 phases
Loads
None
Solar
None
3. Use the onboarding tool
Place R-coil connected to ... On cables connected to ...
1+
P1
2+
P2
3+
P3
The onboarding tool at
onboarding.wattwatchers.com.au
collects the installation
details for each site including device serial number, circuit names and R-Coil size.
Log into the onboarding tool and work through the steps to configure your devices
for the installation site.
4. Validate installation
Check the lights
When installation is completed successfully, all three green lights on the front of the
Auditor should be lit solid. The table below shows the meaning of the lights.
Auditor Indicators
L1
L2
L3
Explanation
Off
Off
Off
Powered off
Blinking
Off
Off
Powering on
Solid
Off
Off
Powered on – connecting to
mobile network
Solid
Blinking
Off
Searching for SIM
Solid
Solid
Off
SIM found
Solid
Solid
Blinking
Waiting for servers
Solid
Solid
Solid
Connection complete
4. Validate installation
continued
Validating that your installation is correct
If...
Then...
Otherwise...
Circuit current rating is less
than the R-coil rating.
The correct size R-coils
are installed.
Contact Wattwatchers
support.
Install data shows three
voltages around 220V, less
than 265V.
The voltage connections
are good.
Check the voltage
connections to P1, P2, P3
are three phases.
Three-phase solar inverter
circuits that have equal
current and PF=1.
Solar R-coils are
installed correctly.
Check R-coil wiring, phase
and orientation.
With the solar inverter
turned off, PF is +ve and
expected value on all
circuits.
Grid and load R-coils are
installed correctly.
Ensure R-coil phase and
orientation are correct.
R-coils on the wrong
phase may cause negative
PF readings. Where there
is solar operating, Grid
circuits show -ve PF if
there is “feed in”.
Current measured with
tongs meter is the same
as current reported in
the data.
The Auditor is
configured correctly.
Check R-coil rings are
fully rotated to the locked
position. Use onboarding
tools to change the R-coil
to the correct size.
Find diagrams for more configurations at
www.wattwatchers.com.au/support
When monitoring solar inverters:
Reverse the R-coil direction so
that the arrow is from the inverter.
The shields of each R-Coil connect
to the respective negative terminal
1-, 2-, 3-
For more detailed fault finding information refer to
www.wattwatchers.com.au/support