Auditor 3R
Complete these f
our eas
y steps,
then start monit
oring your sit
e.
1.
Befor
e you
begin
2. Connect
your Audit
or
3. Use the
onboarding t
ool
4. V
alidate tha
t your ins
tallation is
corr
ect
1. Before you begin
Ensure you have the equipment
- See Auditor 3R checklist below. You’ll need an
internet connected smart device (e.g. smartphone, tablet, laptop) to configure
the Auditor and capture information about the installation. A marker is useful
for numbering Rogowski coil (R-coil) and cables during installation. You’ll need a
clamp meter for checking current measurements.
Check
- That you have 35mm wide space available on the DIN rail. If there is
not space, additional DIN rails may be mounted in the cabinet or an external
enclosure used. Ensure that R-coil can accommodate the cable size (i.e. cable
diameter fits within R-coil opening width).
Ensure there is a way to isolate the Auditor voltage inputs
- An existing or new
circuit breaker can be used depending on the regulations in your jurisdiction.
A breaker is not included in the Auditor package.
Auditor 3R hardware checklist:
• Auditor device - 2-unit wide DIN-mount
• Rogowski Coils - Supplied in a set of three
• Wiring tails - single-phase, 3-phase or both
• Connectors - green-coloured plastic plugs
ATTENTION:
Must be ins
talled by a lic
ensed electrician in ac
cor
dance
with standar
d electrical
safety r
egulations in
your jurisdiction.
ONL Y use this Audit
or with the R-c
oils it is supplied with.
This Audit
or is NOT
compa
tible with thir
d party coils
or split-cor
e Current T
ransf
ormers.