background image

2

Installation Guidelines

•  Consult local codes for specific installation requirements and 

restrictions applicable to your area. FEBCO recommends 

that system supply pressure is at least 20 psi (138 kPa).

•  Install the assembly in the horizontal position with the relief 

valve on the side.

•  Achieve approved flow directions by removing the two bolts 

at the inlet or outlet adapter flange and rotating the ball 

valve/adapter assembly into the desired configuration. (See 

Figures 1, 2, 3, and 4.)

•  Install the valve assembly where relief valve discharge is 

acceptable or where it can be completely drained. The 

valve assembly must be installed where it is accessible for 

periodic testing and maintenance. Clearances shown in 

the installation views apply to exterior, interior, and pit/vault 

installations and are recommendations only. (See Figures 

5 and 6.) These minimums do not apply to removable 

protective enclosures. Refer to local codes for actual 

requirements in your area.

NOTICE

The gap drain is not designed to catch the maximum 

discharge possible from the relief valve. The installation of a 

FEBCO air gap with the drain line terminating above a floor 

drain handles any normal discharge or nuisance spitting 

through the relief valve. However, the floor drain size may 

need to be designed to prevent water damage caused by a 

catastrophic failure condition. Do not reduce the size of the 

drain line from the air gap fitting.

•  Before installing the valve into the line, flush the supply 

line of all foreign material. Failure to flush the supply line 

may cause the check valves to become fouled and require 

disassembly and cleaning.

•  After installation, slowly fill the assembly with water and 

bleed air from the body using test cocks No. 3 and No. 4. 

Test the valve assembly to ensure correct operation. Test 

the valve assembly to ensure correct operation.

NOTICE

All assemblies are tested at the factory for proper operation 

and leakage. If the valve does not pass the field test, its 

failure is most likely due to a fouled check valve. This is not 

covered by the factory warranty. The valve cover(s) must be 

removed and the check seats inspected and cleaned. Any 

damage or improper operation caused by pipeline debris or 

improper installation/start-up is not included in the factory 

warranty.
In case of a possible warranty claim, contact your local 

supplier or FEBCO representative. Do not remove the valve 

assembly from the pipeline.

•  Protect the assembly from freezing and excessive pressure 

increases. Thermal expansion or water hammer can cause 

pressure increases. These excessive pressure situations 

must be eliminated to protect the valve and system from 

possible damage.

•  Use the plastic test cock plugs and tethers provided for 

areas that require them.

Vertical Up Flow In 

Vertical Down Flow Out

Figure 1

Horizontal Flow In 

Vertical Down Flow Out

Figure 2

Vertical Up Flow In 

Horizontal Flow Out

Figure 3

Horizontal Flow In 

Horizontal Flow Out 

Figure 4

18" Min

12" Min

6" Min

12" Min 

(Refer to Local Codes)

Figure 5

Figure 6

Содержание FEBCO 825YA Series

Страница 1: ...ust be retested once maintenance has been performed Corrosive water conditions and or unauthorized adjustments or repair could render the product ineffective for the service intended Regular checking...

Страница 2: ...ap fitting Before installing the valve into the line flush the supply line of all foreign material Failure to flush the supply line may cause the check valves to become fouled and require disassembly...

Страница 3: ...aged parts as required 3 Apply FDA Approved grease to the cover O ring and reassemble the valve in the reverse order of disassembly Relief Valve Disassembly 1 Detach the activation module if installed...

Страница 4: ...will at its option replace or recondition the product without charge THE WARRANTY SET FORTH HEREIN IS GIVEN EXPRESSLY AND IS THE ONLY WARRANTY GIVEN BY THE COMPANY WITH RESPECT TO THE PRODUCT THE COMP...

Страница 5: ...e Un environnement avec des conditions de l eau corrosives et ou des r glages ou des r parations non autoris s peuvent rendre le produit inefficace pour le service pr vu La v rification et le nettoya...

Страница 6: ...t d installer la vanne dans la conduite Le d faut de rincer la conduite d alimentation peut provoquer l encrassement des clapets antiretour et exiger un d montage et un nettoyage Apr s l installation...

Страница 7: ...s es ou endommag es au besoin 3 Appliquez de la graisse approuv e par le FDA sur le joint torique de couvercle et remontez la vanne dans l ordre inverse du d montage D montage de la soupape de d charg...

Страница 8: ...e mat riau et de fabrication dans des conditions normales d utilisation pour une p riode d un an compter de la date d exp dition d origine Si les d fauts susmentionn s venaient se pr senter au cours d...

Страница 9: ...te una vez que se haya realizado el mantenimiento Las condiciones corrosivas del agua y o los ajustes o las reparaciones no autorizados podr an hacer que el producto sea ineficaz para el servicio prev...

Страница 10: ...istro para eliminar toda materia extra a No enjuagar la l nea de suministro puede provocar que las v lvulas de retenci n se contamine y requiera desarmarse y limpiarse Despu s de la instalaci n llene...

Страница 11: ...s residuos Sustituya las piezas desgastadas o da adas seg n sea necesario 3 Aplique grasa aprobada por la FDA a la junta t rica de la cubierta y vuelva a montar la v lvula en el orden inverso al del d...

Страница 12: ...do se usen en forma normal durante un periodo de un a o a partir de la fecha de env o original En caso de que tales defectos se presenten dentro del per odo de garant a la Compa a a su criterio reempl...

Отзывы: