background image

Size 

A

C

D

E (Dia.)

F

in

Pipe Size (in)

Min. Length (in)

in

in

in

in

1

 

1/4

1

3.12

0.38

0.25

0.44

0.55

1

 

1/2

1

3.12

0.38

0.25

0.44

0.50

1

 

1/4

3.38

0.38

0.25

0.44

0.50

2

 

1/2

2

4.0

0.38

0.38

0.56

0.62

2

 

1/2

4.5

0.50

0.38

0.56

0.62

3

5.0

0.50

0.44

0.56

0.62

6.50

0.62

0.44

0.56

0.62

6.  After removing the Stem Nut, the remainder of the Disc & Diaphragm Assembly should disassemble easily. Polish stem guide  

surfaces with fine emery cloth to remove any mineral deposits and inspect for excessive wear. Remove any mineral build-up from 

other components with wire brush or by using a Mineral Dissolving Solution. Inspect parts for wear and replace if necessary.

7.  Inspect valve seat. If seat is not damaged, removal is not necessary. Valve seats 6" and smaller are threaded into the body of the 

valve and require a seat removal tool (Figure 6) (Table 1 details the tool dimensions for seat removal). Valve seats 8" and larger are 

held in the valve body with stainless steel cap screws. Remove seat retaining screws and lift seat straight up (Figure 7).

Figure 7

*Schedule 40 steel pipe

Figure 6

Valve Body

Valve Seat

All-Thread

Nut and Washer

2PLCS

Angle or 

Channel Iron

120

B (Min)          

E  Dia. 4 Holes

    

 

90  Apart        

D         

TYP <3 PLCS>

    

 

120  Apart  

C TYP <3 PLCS>      

F       

A         

Table 1: Seat Removal Tool Dimension

8          IOM-A-ACV-912-11_612-11   2115 

EDP# 1917038 

© 2021 Watts

IOM-A-ACV-912-11_612-11   2115 

EDP# 1917038 

© 2021 Watts         9

Содержание Ames 912GD-11

Страница 1: ...tion 2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica t...

Страница 2: ...valves ensure valve disc does not contact the main valve 6 Provide adequate clearance for valve servicing and maintenance Refer to valve servicing dimensions on next page 7 Avoid installing valves 6...

Страница 3: ...4 16 24 26 28 30 34 40 48 48 Size in 11 4 11 2 2 21 2 3 4 6 8 10 12 14 16 C in 16 16 20 22 22 24 32 34 38 44 48 52 D in 10 10 12 14 14 16 24 26 28 30 34 40 STEP 2 To ensure proper operation any trappe...

Страница 4: ...pressure set point by turning the adjustment screw OUT counterclockwise until downstream pressure decreases to the desired setpoint See Figure 3 STEP 6 Adjust the Surge Control by turning the adjustm...

Страница 5: ...ise increasing the rate of closing Setting the Pressure Sustaining Control Step 1 Setting The Relief Sustaining Control requires lowering the upstream pressure to the desired minimum sustained pressur...

Страница 6: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 7: ...ly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for o...

Страница 8: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 9: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 10: ...ts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrit...

Страница 11: ...el 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iro...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: