background image

Size (in)

3

4

6

8

10

12

16

20 & 24

P/N

0677-01

0677-01

0677-02

0677-03

0677-04

0677-05

0677-09

0677-11

8.  Replace Seat Disc, Diaphragm and Spacer Washers provided in Main Valve repair kit (refer to Table 2 or 3 for correct repair kit part 

number). Re-assemble in the reverse order of disassembly.

9.    

 

Re-Install Disc and Diaphragm Assembly in the valve, taking care not to damage the lower guide area in the center of the valve    

  seat.

10.  Re-install Cover Spring. Replace Valve Cover and tighten Cover Nuts in a crossing pattern to ensure even distribution. Test the Disc 

and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section.

11.  Test the integrity of the Seat Seal by following the Seat Seal Test procedure in previous section.
12.  Return valve to service by following instructions on the Technical Bulletin matching the valve function.

Size (in)

1

 

1/4

1

 

1/2

2

2

 

1/2

10 

12 

14 

16 

P/N

0677-01

0677-01

0677-02

0677-03

0677-04

0677-05

0677-06

0677-07

0677-08

0677-09

0677-10

0677-11

Table 3: Reduced Port Valve (605GD/605AD) Repair Kits

Table 2: Full Port Valve (905GD/905AD) Repair Kits

10          IOM-A-ACV-912-11_612-11   2115 

EDP# 1917038 

© 2021 Watts

IOM-A-ACV-912-11_612-11   2115 

EDP# 1917038 

© 2021 Watts         11

Содержание Ames 912GD-11

Страница 1: ...tion 2 Setting the Pressure Reducing Control 3 Maintenance Schedule 6 Trouble Shooting Guide 6 Valve Disassembly Instructions 8 ACV Schematic 11 Local building or plumbing codes may require modifica t...

Страница 2: ...valves ensure valve disc does not contact the main valve 6 Provide adequate clearance for valve servicing and maintenance Refer to valve servicing dimensions on next page 7 Avoid installing valves 6...

Страница 3: ...4 16 24 26 28 30 34 40 48 48 Size in 11 4 11 2 2 21 2 3 4 6 8 10 12 14 16 C in 16 16 20 22 22 24 32 34 38 44 48 52 D in 10 10 12 14 14 16 24 26 28 30 34 40 STEP 2 To ensure proper operation any trappe...

Страница 4: ...pressure set point by turning the adjustment screw OUT counterclockwise until downstream pressure decreases to the desired setpoint See Figure 3 STEP 6 Adjust the Surge Control by turning the adjustm...

Страница 5: ...ise increasing the rate of closing Setting the Pressure Sustaining Control Step 1 Setting The Relief Sustaining Control requires lowering the upstream pressure to the desired minimum sustained pressur...

Страница 6: ...specification sheets for approximate cover capacity A continuous flow of water from the open port indicates a damaged diaphragm or loose disc diaphragm assembly Disassemble valve and replace diaphragm...

Страница 7: ...ly by partially opening from full closed position Improperly configured opening speed control if equipped Adjust opening speed control to verify functionality adjust as required Standard setting for o...

Страница 8: ...move cover nuts and washers 3 Remove the cover If cover is not free to be removed loosen it by tapping upward along its outside edge with a dull cold chisel pic tured above a Large valves may require...

Страница 9: ...rush or by using a Mineral Dissolving Solution Inspect parts for wear and replace if necessary 7 Inspect valve seat If seat is not damaged removal is not necessary Valve seats 6 and smaller are thread...

Страница 10: ...ts in a crossing pattern to ensure even distribution Test the Disc and Diaphragm Assembly for smooth travel by following the Freedom of Movement Test procedure in previous section 11 Test the integrit...

Страница 11: ...el 9 Stem Washer ASTM A276 304 Stainless Steel 10 Diaphragm Washer ASTM A536 65 45 12 Epoxy Coated Ductile Iron 11 Diaphragm Buna N Nitrile 12 Disc Retainer ASTM A536 65 45 12 Epoxy Coated Ductile Iro...

Страница 12: ...resulting from labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemical or any other circumstances over which the Company has no cont...

Отзывы: