Innovation Water Heaters
– Edge [i] Controller
Venting and Combustion Air Design Guide
TAG-0090_A
•
GF-5056
•
2/20/2020
Technical Support
•
(800) 526-0288
•
Mon-Fri, 8 am - 5 pm EST Page 2 of 39
Table of Contents
CODES, SAFETY & VENTING SYSTEMS ................................................... 3
COMBUSTION AIR SYSTEM ...................................................................... 8
Two-Permanent-Openings Method (USA Only)................................................. 10
Installation REQUIREMENTS for Venting Through a Wall ........................................... 21
Common Vent CONDENSATE DRAINAGE ................................................................. 26
3.7.2 Innovation 600N Combustion Air Duct Pressure Drop Tables .............................. 28
3.7.3 Innovation 800N Combustion Air Duct Pressure Drop Tables ............................... 31
3.7.4 Innovation 1060N Combustion Air Duct Pressure Drop Tables ........................... 33
3.7.5 Innovation 1350NCombustion Air Duct Pressure Drop Tables ............................ 35