6
- Electrical Connection -
1. Connect the power cord and plug power supply into a 115 volt / 60 Hz receptacle.
Note :
Do not plug into an outlet controlled by a wall switch or pull chain that could inadvertently be turned off
Electronic Connections
P = Power Supply
B = Powered in Backwash Step Only
(Cycle #1)
S = Powered for Entire Regen. Cycle
Installation
- Drain Line Connection -
1. The drain line flow control assembly is pre-assembled for your convenience. Should you choose to hard plumb the
drain line, please remove the barb fitting. The flow control housing can be removed by removing the clip and pulling
straight out on housing.
Note:
When re-installing the drain line flow control housing, be sure you hear and feel the O-Ring pop into place before
inserting the clip.
2. Install 1/2” I.D. drain line tubing (not included) from hose barb to an open drain. A 4” gap between end of the drain line
and the open drain is required to prevent waste water backflow. Keep the drain line as short as possible. An overhead
drain line can be used if necessary, but should discharge below the control valve. A syphon trap (taped loop) at the
outlet of the drain line is advisable to keep the drain line full and assure correct flow during backwash. Elbows or other
fittings must be kept at a bare minimum.
Note:
Where the drain line is elevated above the control valve or exceeds 20 feet in length, 3/4” I.D. drain line tubing
should be used.
P B S
Содержание ISOBAR II
Страница 1: ...Installation Operation Manual...
Страница 18: ...18 Valve Body Drive Assy...
Страница 25: ...25 Warranty...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28 710 Orange Street Ashland OH 44805 PH 419 289 1500 FAX 419 289 1515 www watersoftinc com 3 2018...