13
Regeneration Cycle
Note
: Depending upon system pressure and other factors, it is possible to observe flow to drain in the rest cycle.
-
When the valve is between positions, the display will flash the number of the step it is moving towards.
-The default time at which regeneration will occur is 12:00 a.m.
The motor’s run direction during a particular regeneration cycle step is indicated by the rotation direction of the last 2 digit
displays.
Example:
5
-
Centuri
Default Cycle Step Times Minutes
Step 1
Air Release (non-adjustable)
6
Step 2
Backwash
10
Step 3
Rest
5
Step 4
Air Replenish
20
Step 5
Rapid Rinse
5
Programming the Control Valve
Содержание ISOBAR II
Страница 1: ...Installation Operation Manual...
Страница 18: ...18 Valve Body Drive Assy...
Страница 25: ...25 Warranty...
Страница 26: ...26...
Страница 27: ...27...
Страница 28: ...28 710 Orange Street Ashland OH 44805 PH 419 289 1500 FAX 419 289 1515 www watersoftinc com 3 2018...