12
Starting Extra Regeneration Cycle
1. To Start
Delayed Extra Cycle
- Press and hold the
Set/Change
button for 3 seconds until the display reads ‘0000’
- Regeneration cycle will initiate at the next designated regeneration time.
2. To start
Immediate Extra Cycle
First complete above step.
- With Gallons Remaining Until Next Regeneration at ‘0000’,
- Press and hold the
Set/Change
button.
- After 3 seconds, the regeneration cycle will begin.
3. To
Fast Cycle
thru regeneration
First complete above 2 steps.
Note
:
Press and hold the
Set/Change
button for 3 seconds to advance to the next cycle step.
Fast Cycle is not necessary unless desired to manually step through each cycle step.
(Repeat until valve returns to the home display)
Normal Operation
1.
Home Display
The RS1
model will alternate the Time of Day and Gallons left until the next regeneration. The me
ter will count down to zero (0000) and then regenerate at the scheduled time set.
Softeners
Default (Min)
Step 1
Backwash
10
Step 2
Brine & Rinse
60
Step 3
Rapid Rinse
10
Step 4
Brine Refill
9 lbs/ cu ft
Start Up Procedure