
Maintenance schedule
4-3
Maintenance schedule
The following table lists periodic maintenance schedules that ensure optimum
instrument performance.
Maintenance schedule
Procedure
Frequency
For information...
Clean the instrument case.
As required.
Empty the nitrogen exhaust
trap bottle.
Check daily, empty as
required.
Inspect and adjust the
roughing pump oil level.
Weekly.
Replace the roughing pump
oil and oil mist filter.
Annually.
See
Clean the source components. When they are visibly
fouled, the background
or high-peak
contaminants are
unacceptably high or
sensitivity decreases to
unacceptable levels.
Replace the ESI probe tip.
When sensitivity
decreases to
unacceptable levels.
Replace the ESI probe
capillary.
When sensitivity
decreases to
unacceptable levels or
sample flow is
inconsistent.
Replace the ion block heater
cartridge.
If the heater fails to
heat when the
instrument is pumped
down (evacuated).
Replace the source assembly
seals.
Annually.
See
Содержание Xevo TQ MS
Страница 10: ...x...
Страница 42: ...2 10 Preparing the Mass Spectrometer for Operation...
Страница 129: ...Replacing the air filter 4 81...
Страница 130: ...4 82 Maintenance Procedures...
Страница 146: ...B 4 Materials of Construction and Compliant Solvents...
Страница 178: ...D 4 Plumbing the IntelliStart Fluidics system...