Waterlogic 1000 GF Technical Manual - Issue A, July 2011
Pre Delivery Inspection
Procedures (Pdi)
CAUTIONS:
Only competent trained technicians should work on Waterlogic products.
Waterlogic units may weigh over 25KG. We recommend caution when lifting.
Packing materials could present a trip hazard. Keep them off the floor.
Take care not to allow the power lead to get wet. Do not wet test the filters and
membrane if the machine is to be stored or transported for more than 7 days after
Pre Delivery Inspection.
Flush carbon filters outside of the machine do not flush carbon fines into the
machine.
1.
Remove packing straps and unpack unit and visually inspect for any damage.
(Report any defects to Waterlogic as soon as possible).
2.
Place the unit on a suitable flat surface.
3.
Open the top cover by removing the 2 screws located at the rear of the top
cover.
4.
Visually inspect all electrical connections and power lead.
5.
Visually inspect all water connections and the header tank is located correctly.
6.
Remove the lower front panel located by undoing two locking screws on the
left and right side of the lower front panel and releasing two locating clips on the
front underside of the lower front panel inspect electrical connections, water con-
nections, and that the filters and RO membrane are located correctly.
7.
Connect to a potable drinking water supply limited to 3 bar, via a 1/4” John
Guest tube and adapter.
8.
Connect the reject water drain tube to a suitable waste away or re-use system.
9.
Ensure the red switch at the rear of the machine is off now connect to an ap-
propriate power supply.
10.
Turn on water supply and turn on the power supply.
11.
Flush the carbon filters outside of the 1000 GF to waste before filling the ma-
chine.
12.
The unit will automatically fill the header water tank.
13.
Note the hot tank will automatically fill but the cold water faucet must be held
in to fill the cold tank.
14.
Select the cold button and ambient button until water flows clearly.
15.
Select hot + hot safety button until water flows clearly.
16.
After cold/hot water has filled, turn on the green and the red heater/compres-
sor switches. Allow up to one hour for the unit to heat and chill. Test the water
temperatures with a thermometer.
17.
Check WL 1000 GF functions correctly.
18.
Turn off power and water.
19.
Turn unit around and drain all the water from the machine from rear drain
valves.
20.
Clean and repack ready for despatch.
21.
Waterlogic recommends that all units are fully electrically safety tested (PAT) on
site by the commissioning engineer as damage may have occurred during transit
to the unit’s final destination.