3
CYCLE SEQUENCE
CYCLE SEQUENCE instructions allows the setting of the order of
the cycle. There are 9 cycles which can be arranged in any order.
Later in this book the INSTALLER SETTINGS allow the setting of
how long cycles will last.
END must be used as the last cycle option. The SERVICE cycle should only be used in brine prefill applications.
If using upflow brine verify that the valve is configured as follows:
1. upflow piston is installed; and
2. injector is located in up hole and injector plug is in down hole.
The following is an example of how to set a valve so that when regeneration is initiated BACKWASH occurs first,
dn
BRINE occurs second, RINSE occurs third, and FILL occurs fourth.
STEP 1CS
STEP 2CS
STEP 3CS
STEP 4CS
STEP 5CS
STEP 6CS
Step 1CS – Press NEXT and
simultaneously for 3 seconds until SOFTENING or
FILTERING appears on the display and release. If SOFTENING doesn’t appear, use the
or
button to display it. Then press NEXT and
again for 3 seconds and release. If
screen in Step 2CS does not appear in 5 seconds the lock on the valve is activated. To
unlock press
,
NEXT
, and SET CLOCK in sequence, then press NEXT and
simultaneously for 3 seconds and release.
Then press NEXT and
again for 3 seconds and release.
Step 2CS – Press the
or
, buttons until BACKWASH
appears. Press NEXT to go to Step 3CS.
Press REGEN if you need to return to the previous step.
Step 3CS - Press the
or
buttons until dn BRINE
appears. Press NEXT to go to Step 4CS.
Press REGEN if you need to return to the previous step.
Step 4CS - Press the
or
buttons until RINSE
appears. Press NEXT to go to Step 5CS.
Press REGEN if you need to return to the previous step.
Step 5CS - Press the
or
buttons until FILL
appears. Press NEXT to go to Step 6CS.
Press REGEN if you need to return to the previous step.
Step 6CS - Press the
or
buttons until END
appears. Press NEXT to exit CYCLE SEQUENCE.
Press REGEN if you need to return to the previous step.
CYCLE OPTIONS
BACKWASH
DN BRINE
FILL
END
RINSE
UP BRINE
SOFTENING OR
FILTERING