OXISWIM MANUAL
P a g e
9 | 45
3
WHAT IS IN THE BOX
1)
1 x Wall-mounted panel with Chemical Controller, Timer, and Pump Power Outlet
2)
1 x Hydroxyl Radical Generator
3)
2 x Chemical injection assemblies
4)
2 x Chemical hose connections kits
5)
2 x Chemical pick-up and float pieces
6)
1 x Oxiswim Sanitiser (Electrolysis equipment)
Additional materials required, but not supplied in kit
The following items may be required to install the Hybrid system but are not supplied in the
kit:
•
40mm/48mm/1 ½ in or 50mm/63mm/2 in pipe and fittings
•
UPVC Pipe Adhesive and Primer
•
Mounting screws for wall-mounted panel
•
Cable Ties
•
Hole saw 22mm (55/64 in)
Recommended Tools
The following tools will be required as a minimum for the installation:
•
Cordless Drill
•
Hammer Drill (if mounting on a masonry wall)
•
Philips Head Screwdriver
•
PVC Saw
•
Adjustable wrench 0-25mm (1in) or 10mm (25/64 in) Socket and Multigrips
•
Utility knife
Содержание OXISWIM
Страница 1: ...D U A L S A N I T I S A T I O N Installation and Operation manual Version 1 1 3 December 2022 ...
Страница 11: ...OXISWIM MANUAL P a g e 11 45 INSTALLATION AND COMMISSIONING ...
Страница 15: ...OXISWIM MANUAL P a g e 15 45 Oxiswim Typical Installation Layout ...
Страница 28: ...OXISWIM MANUAL P a g e 28 45 OPERATION AND MAINTENANCE ...