OXISWIM MANUAL
P a g e
20 | 45
Figure 5.13
Figure 5.14
LEFT Peristaltic Pump HEAD (pH)
RIGHT Peristaltic Pump HEAD (hydrogen
peroxide or chlorine )
Repeat, so both tubes are now connected with one end joined to the chemical injection
point, and the other joined to the RIGHT-HAND SIDES (discharge sides) of the chemical
dosing unit pumps.
6.4.1 Connect chemical dosing unit to chemical supply tanks.
Ensure that the supply tanks are positioned no less than 1.5m (5ft) apart.
Содержание OXISWIM
Страница 1: ...D U A L S A N I T I S A T I O N Installation and Operation manual Version 1 1 3 December 2022 ...
Страница 11: ...OXISWIM MANUAL P a g e 11 45 INSTALLATION AND COMMISSIONING ...
Страница 15: ...OXISWIM MANUAL P a g e 15 45 Oxiswim Typical Installation Layout ...
Страница 28: ...OXISWIM MANUAL P a g e 28 45 OPERATION AND MAINTENANCE ...