OXISWIM MANUAL
P a g e
19 | 45
Figure 5.11 Connection Point Assembly6
6.3.2 Take one end of the chemical supply tube and feed it through the tightening nut and
holding ring. Then push the end of the tube over the pipe holder. Ensure that the
tube is pushed on firmly over the tip and screw the tightening nut hand tight. See the
images below.
Figure 6.12 Connecting acid feed line to the injector
6.4
Connect Chemical Injection Points to the Chemical Dosing Unit
Cut the chemical supply tube connected to the chemical injection point to a suitable length
allowing enough slack. Then feed the tightening nut and holding ring over the tube. Next,
push the open end of the tube onto the pipe holder in the base of the chemical dosing unit
RIGHT-HAND SIDE (discharge side Figure 5-13) and screw the collar hand tight (Figures 5-
14).
Содержание OXISWIM
Страница 1: ...D U A L S A N I T I S A T I O N Installation and Operation manual Version 1 1 3 December 2022 ...
Страница 11: ...OXISWIM MANUAL P a g e 11 45 INSTALLATION AND COMMISSIONING ...
Страница 15: ...OXISWIM MANUAL P a g e 15 45 Oxiswim Typical Installation Layout ...
Страница 28: ...OXISWIM MANUAL P a g e 28 45 OPERATION AND MAINTENANCE ...