Page 14
WS1HR & WS1.25HR Manual
OEM General Instructions
The control valve offers multiple procedures that allow the valve to be modifi ed to suit the needs of the installation. These
procedures are:
•
OEM Cycle Sequence
•
OEM Softener System Setup
•
OEM Filter System Setup
•
Installer Display Settings
•
User Display Settings
• Diagnostics
• Valve
History
Once the OEM Cycle Sequence has been set, the other procedures can be accessed in any order. Details on each of the procedures
are provided on the following pages.
At the discretion of the manufacturer, the fi eld technician can access all settings. To “lock out” access to diagnostic and valve
history displays and modifi cations to settings except hardness, day override, time of regeneration and time of day by anyone but the
manufacturer, press
▼
, NEXT,
▲
, and CLOCK in sequence after settings are made. To “unlock”, so other displays can be viewed
and changes can be made, press
▼
, NEXT,
▲
, and CLOCK in sequence.
When in operation normal user displays such as time of day, gallons remaining before regeneration, days remaining before
regeneration or lbs. salt remaining before regeneration are shown. When stepping through a procedure, if no buttons are pressed
within fi ve minutes, the display returns to a normal user display. Any changes made prior to the fi ve minute time out are
incorporated.
To quickly exit OEM Softener Setup, OEM Filter Setup, Installer Display Settings, Diagnostics or Valve History press CLOCK.
Any changes made prior to the exit are incorporated.
To clear the service call reminder, press the
▲
and
▼
buttons simultaneously while CALL is displayed.
When desired, all information in Diagnostics may be reset to zero when the valve is installed in a new location. To reset
to zero, press NEXT and
▼
buttons simultaneously to go to the Service/OEM 1 screen, and release. Press
▲
and
▼
simultaneously to reset diagnostic values to zero. Screen will return to User Display.
Sometimes it is desirable to have the valve initiate and complete two regenerations within 24 hours and then return to the preset
regeneration procedure. It is possible to do a double regeneration if the control valve is set to “NORMAL” or “ on 0” in
OEM Softener System Setup or OEM Filter System Setup. To do a double regeneration:
1. Press the “REGEN” button once. REGEN TODAY will fl ash on the display.
2. Press and hold the “REGEN” button for three seconds until the valve regeneration initiates.
Once the valve has completed the immediate regeneration, the valve will regenerate one more time at the preset regeneration time.
Proportional Brining
If the system is set up as a prefi ll upfl ow softener, the control valve can also be set to normal or proportional brining.
This step will appear after Step 7S and before Step8S if the system is set up as a prefi ll upfl ow softener.
The following options can be selected:
• NORMAL FILL - System always prefi lls with the salt level selected.
• ProP FILL - If proportional brining is selected the actual salt level fi ll will be calculated by dividing the
actual volume treated by the calculated volumetric capacity, then multiply the salt level fi ll selected by
this percentage.
Press NEXT to go to the next step. Press REGEN to return to the previous step.
Содержание WS1.25HR
Страница 2: ......
Страница 13: ...WS1HR WS1 25HR Manual Page 13 Figure 3 Figure 4 Figure 1 Figure 2...
Страница 30: ...Page 30 WS1HR WS1 25HR Manual Drawings and Part Numbers...
Страница 42: ...Page 42 WS1HR WS1 25HR Manual Flow Diagrams Service and Backwash...
Страница 43: ...WS1HR WS1 25HR Manual Page 43 Flow Diagrams Downflow and Upflow WS1HR Only...
Страница 44: ...Page 44 WS1HR WS1 25HR Manual Flow Diagrams Rinse and Fill...
Страница 54: ...Page 54 WS1HR WS1 25HR Manual...
Страница 55: ...WS1HR WS1 25HR Manual Page 55...
Страница 56: ...Page 56 WS1HR WS1 25HR Manual...
Страница 57: ...WS1HR WS1 25HR Manual Page 57...
Страница 58: ...Page 58 WS1HR WS1 25HR Manual...
Страница 59: ...WS1HR WS1 25HR Manual Page 59...