2. INSTALLATION PERSONNEL SECTION
2.1. CONTENTS OF THE PACKING BOX
Warmhaus is delivered in two boxes as Boiler and Flue Set Box. The Boiler box contains the materials listed below and the small box contains
I. Installation Scheme (Figure 1)
II. Operation Manual (Figure 2)
III. Connection Accessories (Figure 3)
a.
1 throttle screw (installed at flue outlet.)
b.
2 hanger screws
c.
2 Dowels
IV. Hanger Plate (Figure 4)
V. Exhaust Gas Flue Set (optional) (Figure 5)
Figure 1
Installation scheme
Figure 3
Hanger Plate and Connection Accessories
Keep packaging materials (plastic, bag, nylon, etc.) away from
children in order to avoid risks to health.
Figure 2
Operation Manual
471
1000
GAS
G3/4"
G3/4"
G3/4"
80 mm
65 mm
65 mm
64 mm
725 mm
592 mm
422 mm
G1/2"
G1/2"
75 mm
73 mm
Ø110 mm
114 mm
(OPTIONAL)
Priwa ERP / Priwa ERP Plus
Enerwa / Enerwa Plus
150.11.606.000028
Figure 4
Exhaust gas flue set
7
warmhaus.com
Содержание Enerwa Plus 2500 H
Страница 2: ...EnerwaPlus 2500 H EnerwaPlus 3000 H EnerwaPlus 3500 H...
Страница 41: ...41 Enerwa Plus 2500 H 54 Enerwa Plus 3000 H 33 50 Enerwa Plus 3500 H 41 warmhaus com...
Страница 42: ......