90
Permanent air vent
The boiler requires a permanent and adequate air supply in order for it to operate safely and
efficiently.
In accordance with current Building Regulations the installer may have fitted a permanent air
supply vent into the room in which the boiler is installed to provide combustion air. This air vent
should not under any circumstances be shut off or sealed.
USER OPERATING INSTRUCTIONS
Please read the important notices given above before referring to the main instruction book for
detailed operating instructions.
Frequency of cleaning ash and residues from combustion chamber and ash-box
The owner is required to regularly carry out this cleaning operation and the frequency will
depend on the heating load. When first put to use the boiler should be checked on a daily basis
and experience will show how often this will eventually be required. Remember also that during
the main heating season the cleaning interval will shorten as the load on the boiler will be
higher.
Recommended fuels
The boiler is designed to burn only specialized either compressed wood pellets or wood chips
which are detailed in the main instruction book. Under no circumstances should you attempt to
burn any other type of fuel.
General Maintenance
It is important that any glass or other decorative surfaces are kept clean using the appropriate
cleaning materials and techniques as to not damage the internal or external finishes of the
boiler.
Spare Parts
For more information on obtaining spare parts, please revert to the specific page of the
manufacturer’s original instruction manual or contact details provided.
HETAS Ltd Approval
This appliance has obtained HETAS Ltd approval for burning either compressed wood pellets or
wood chips as specified in the main instruction manual. Approval does not cover the use of
other fuels either alone or mixed with the recommended fuel, nor does it cover instructions for
the use of other fuels.
Содержание WS18
Страница 20: ...16 Figure 18 Flow Chart...
Страница 75: ...71 INTENTIONALLY LEFT BLANK...
Страница 87: ...83 9 APPENDIX A SUPPLEMENTARY INSTALLATION AND OPERATING INSTRUCTIONS FOR THE UK MARKET...
Страница 95: ...91 10 APPENDIX B CUSTOMER CONNECTION WIRING SCHEMATIC...
Страница 96: ......