69
7 APPLIANCE INSTALLATION/COMMISSIONING CERTIFICATE &
REGISTRATION.
Instructions.
•
Complete the Installation/Commissioning Certificate.
•
Complete the Installation/Commissioning Certificate overleaf.
•
Fill out all relevant sections of the Installation/Commissioning Certificate using BLOCK
CAPITALS. Please write legibly.
•
Ensure that the certificate is signed by both the Competent Person and the Customer.
•
Carbon copies of the certificate are produced automatically.
•
Register the Appliance.
•
Remove the white copy of the Installation/Commissioning Certificate.
•
Send the certificate to Warmflow
- By post using the envelope provided to:
Warmflow Engineering Co. Ltd.
Lissue Industrial Estate
Moira Road
Lisburn
Co. Antrim
Northern Ireland
BT28 2RF
OR
- By fax on 02892620869
If the appliance is not registered, warranty may be invalidated.
Содержание WS18
Страница 20: ...16 Figure 18 Flow Chart...
Страница 75: ...71 INTENTIONALLY LEFT BLANK...
Страница 87: ...83 9 APPENDIX A SUPPLEMENTARY INSTALLATION AND OPERATING INSTRUCTIONS FOR THE UK MARKET...
Страница 95: ...91 10 APPENDIX B CUSTOMER CONNECTION WIRING SCHEMATIC...
Страница 96: ......