54
If the flue gas temperature is above 160°C or a CO value above 400ppm continually please
contact Warmflow. Please refer to Table 1 for flue gas temperatures at maximum and minimum
outputs.
Following flue gas analysis, ensure that the silicone plug is firmly re-inserted into the
inner flue test point aperture. The weatherproof collar can then be positioned and sealed
as per Section 3.4 of this manual.
Anti Condensation valve
The appliance has an anti-condensation valve factory-fitted which must not be removed or
tampered with in any way. The valve is controlled by the appliance’s user interface controller
and will ensure a return temperature of 55°C to pro mote longevity of the heat exchanger.
Commissioning Records.
All product warranties will be invalidated if the appliance is not commissioned by a Warmflow
engineer or other trained and competent engineer and the combined installation/commissioning
certificate (See Section 7 of this manual) returned to Warmflow within 30 days from the date of
installation and 90 days from the date code stamped on the appliance. A copy of this certificated
should remain with the appliance/householder.
STEP 8 - User introduction to the appliance.
After the installation and commissioning of the appliance. This is the most important
procedure after the correct installation of the appliance. A correctly completed user
introduction will aid the end user by making them aware of the normal operating
conditions and safe maintenance practices.
Identify who the main users of the appliance will be, and ensure they are presented with
the quick start guide, and this document.
Talk through the quick start guide along with the appliance, and ensure they are familiar
with the main components of the appliance, how and when to fill the hopper, how and
when to clean the combustion pot and ash pan, how to use the user accessible menus
within the user interface controller, and how to interpret and reset alarms.
Содержание WS18
Страница 20: ...16 Figure 18 Flow Chart...
Страница 75: ...71 INTENTIONALLY LEFT BLANK...
Страница 87: ...83 9 APPENDIX A SUPPLEMENTARY INSTALLATION AND OPERATING INSTRUCTIONS FOR THE UK MARKET...
Страница 95: ...91 10 APPENDIX B CUSTOMER CONNECTION WIRING SCHEMATIC...
Страница 96: ......