36
Press the »Start« button. Both »Start« LED flash green.
When the unit is fully loaded, the preparation programme takes
> approx. 6 min 30 sec (Assistina 3x3) or
> approx. 6 min (Assistina 3x2)
and runs automatically.
Hygiene and maintenance– preparation process (with time indication)
The preparation process has finished correctly.
All LED light up green.
The preparation process is performed.
The time is shown in phases. After each previous phase, the LED is lit. During the phase, the
LED flashes.
> The amount of W&H Activefluid, MC-1100 and W&H Service Oil F1, MD-200 used in the preparation process is carefully
metered.
> If fewer than 3 transmission instruments are loaded, the preparation process is shortened accordingly and the
consumption of process fluids is correspondingly lower.