3
Contents
8.
Hygiene and maintenance ........................................................................................................................................................30 – 36
> General information (30)
> Description of the process (31)
> Description of the adaptors (32)
> Connection/disconnection of the adaptors (33)
> Loading/removing transmission instruments with ISO and Roto Quick connections (34)
> Loading/removing transmission instruments with a fixed RM connection (35)
> Preparation process (with time indication) (36)
9.
Cleaning and disinfection .........................................................................................................................................................37 – 40
> Device and RM/ISO adaptor (37 – 38)
> Waste drawer, cover, external cleaning ring (39)
> Start-up after cleaning and disinfection (39 – 40)
10. Maintenance...............................................................................................................................................................................41 – 43
> Emptying the waste drawer (41)
> Replacing O-rings (42)
> Replacing the air filter (43)