SEPCOM
®
Vertical
8.0 REPLACEMENT OF PARTS
2
SEP.SEPCOM_Vertical.--.M.A4.0722.EN Issue: A4
07.22
50
4)
Unscrew the fixing bolts of the screen
basket fixing bars and of the compaction
module.
5)
Remove the fixing bars, the screen and
the compaction module.
Wash the screen with pressurized hot water.
Important
Repeat the same operations for the screen installed on the other side of the separator.
If required, pick a new screen and fit it back in the special centrings.
Install back the screen by following the steps previously indicate and restore the operation of the equipment.
Important
Before closing back the chutes to release first the safety pin (see image below).