5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
34
SBB-HFF
9) Fix the beam 3 for the hoist on hoist frame using the 8
M20 bolts and tighten the assembly firmly.
10) Using a suitable crane or forklift truck lift the entire
block A and position it on top of the hopper frame B
taking care to align the holes of the connecting flanges.
Insert the connecting bolts and tighten them.
Now tighten all the bolts of the chassis and carry out a
final check on all the bolts to make sure they are tight
-
ened perfectly.
Important
Use a torque wrench to ensure the following tightening torques:
M16 screws: 225 Nm
M18 screws: 439 Nm
Содержание SBB 125 C
Страница 57: ......