5.0 INSTALLATION AND FIXING
2
EXT.SBB-HFF.--.M.A.0219.EN Issue: A
02.19
25
SBB-HFF
5.3 Installation
CODE
Ø
PLATE HOLE
mm
N. OF HOLES
MAX. PULL FOR FIXING
SBB125C
16.5
12
/
SBB125S
16.5
12
/
SBB125M
22
8
1250 daN
Earth wire
Ø
PLATE BORE
While defining the installation of the equipment, take into account the space required for maintenance and ac
-
cess, for loading the FIBCs, especially as regards height, as it is variable.
This space depends on the lifting and handling equipment available at the work site.
The place in which the equipment is located must have the necessary connections (electricity, air, etc.) for
operating the equipment.
It is the Customer’s responsibility to equip the assembly area in accordance with the existing regulations and
safety requirements: aeration, earthing, etc.
Assembly instructions:
- Lift and position the equipment (according to the procedure indicated on the previous page) near the supply
lines.
- Countermark the position of the four anchor holes on the ground corresponding to the frame supporting
plate.
- Move the frame, make the bores as shown in the Table and reposition the equipment.
- Check that the equipment is longitudinally and transversely perfectly level on a floor made in beton.
- Fit the plugs into the bores and tighten them.
Содержание SBB 125 C
Страница 57: ......