Chapter 4 Liftgate Installation
36
GR00114
Weld bridge to lift arms 100% as shown.
FINAL INSTALLATION OF BRIDGE
GR00115
Bridge will pivot over back of platform when lowered.
Mark back of platform as a no loading area as
necessary.
LOADING AREA
GR00106
OPERATION CHECK
•
Turn shut-off switch on (located in cab)
•
Always make certain area in which platform
will open is clear
•
Push and hold tilt switch then lower switch
to unfold platform