23
4.3 BREAK-IN
4.4
PRE-OPERATION CHECKLIST
Although there are no operational restrictions on the
Ultra-Veyor System when used for the first time, it is
recommended that the following mechanical items
be checked:
A.
After operating for 1/2 hour:
1. Retorque all fasteners and hardware.
2. Turn blower and airlock by hand. Be sure
that they turn freely.
3. Check that no hoses are pinched, rubbing
or being crimped. Re-align as required.
4. Check oil level in reservoirs. Add as
required.
5. Lubricate all grease fittings.
B.
After operating for 5 hours and 10 hours:
1. Retorque all bolts, fasteners and hardware.
Efficient and safe operation of the Walinga Ultra-
Veyor System requires that each operator reads and
understands the operating procedures and all
related safety precautions outlined in this section. A
pre-operation checklist is provided for the operator.
It is important for both the personal safety and
maintaining the good mechanical condition of the
Ultra-Veyor that this checklist is followed.
Before operating the Ultra-Veyor and each time
thereafter, the following areas should be checked
off:
1. Lubricate the machine per the schedule outlined
in Section 5 Service and Maintenance.
2. Check the oil level in the blower reservoirs.
3. Inspect all air lines, hoses, fittings and couplers
for tightness.
4. Check that the blower and airlock turn freely.
2. Check hose routing.
5. Check for and remove entangled material.
3. Check that blower and airlock turn freely. 6. Close and secure all guards.
4. Check oil level in reservoirs.
5. Then go to the normal servicing and maintenance
schedule as defined in the Maintenance Section.
Содержание ULTRA-VEYOR SYSTEM
Страница 1: ...ULTRA VEYOR SYSTEM OPERATOR S MANUAL...
Страница 2: ......
Страница 4: ......
Страница 19: ...17 3 SAFETY SIGN LOCATIONS Think SAFETY Work SAFELY B A B B SAFETY DECALS BLOWER B A A...
Страница 53: ...51...
Страница 55: ......