WAGO I/O System 750
Appendix 175
750-8210/040-000 PFC200; G2; 4ETH; XTR
Manual
Version 1.7.0, valid from FW Version 04.01.10(23)
15.2.1.2
“Configuration” Tab
15.2.1.2.1
“PLC Runtime Configuration” Page
On the "PLC Runtime Configuration" page, you will find the settings for the boot
project created with the programming software and the settings for the web
visualization created in the runtime system.
“General PLC Runtime Configuration” Group
Table 73
: WBM “PLC Runtime Configuration” Page – “General PLC Runtime Configuration” Group
Parameter
Meaning
PLC runtime version
Select here the PLC runtime system to be enabled.
None
No runtime system is enabled.
CODESYS V3
CODESYS V3 runtime system is
enabled.
Home directory on memory
card enabled
Define if the home directory for the runtime system
should be moved to the memory card.
Disabled
The home directory is stored in
the internal memory.
Enabled
The home directory is moved to
the memory card.
All data is deleted when switching the runtime system!
The runtime system’s home directory is completely deleted when switching the
runtime system!
Only the first partition can be used as the Home directory!
Only the first partition of a memory card can be accessed at
/media/sd
and used
as the home directory.
Click
[Submit]
to apply the change. The runtime system change is effective
immediately.
The home directory change only takes effect after the product restarts. For this
purpose, use the WBM reboot function. Do not switch off the product too early!