
43
VERSION 01/2020
ORDER NUMBER DOC2340282
IceBreaker 150-300 cm
3
8.2.3 SAFETY CHECKS AND MAINTENANCE WORK
Every day
Check grounding: see Chapter
.
Check hoses, tubes and couplings: see Chapter
Check the level of separating agent in the separating agent tank and top up, if
necessary, in accordance with Chapter
.
For each decommissioning, the process according to Chapter
must be followed.
If the pump has to be emptied for maintenance work, proceed according to
Chapter
Weekly
Check system for damage.
Check that the safety fixtures function properly (see Chapter
Yearly or as required
In accordance with DGUV regulation 100-500 Chapter 2.29 and 2.36:
– The liquid ejection devices should be checked by an expert (e.g., WAGNER
service technician) for their safe working conditions as required and at least
every 12 months.
– For shut down devices, the examination can be suspended until the next start-up.
8.2.3.1 FILLING WITH SEPARATING AGENT
NOTICE
Piston pump dry run!
High wear/damage to the packings.
Paint or solvent can escape if the seals are dry.
Ensure that the separating agent tank is filled with sufficient separating agent.
Pour the supplied separating agent into the intended opening.
B_03918
Separating agent: Order no. 9992504
Filling level:
1 cm; 0.4 inch under the cup edge.
Inclination angle of the pump
Maximum permissible inclination of pump for moving, transportation, etc. after
filling it with separating agent ± 30°.
The pump must be vertical during operation.