EN
95
AirConServiceCenter
Operation
8.7
Free selection
I
The following four processes can performed individually in the
“Free
selection”
menu:
Recycling phase: extraction, recycling of the refrigerant, pressure rise
test, draining the waste oil.
Vacuum phase: evacuation of the system, leak test / vacuum check.
Filling phase: filling with fresh oil, filling of UV additive, filling of refrig-
erant.
Selecting connections: The air conditioning system has a high pres-
sure and low pressure connection, high pressure or low pressure only
connections.
After each process has been performed, a service report is printed.
1. Start by fitting the connections of the AirConServiceCenter to the
vehicle air conditioning system, and opening them.
2. In the basic menu, use the cursor keys
or
to select
“Free
selection”
:
3. Press
ENTER
to confirm.
4. Enter the vehicle data and press
ENTER
to confirm.
NOTE
The
“Free selection”
menu is used to perform air conditioning servic-
ing step-by-step. You can perform the same processes as in the short
selection menu, but also omit individual procedures. In addition, it is
possible to enter the values for each individual process using the key-
pad. You can also enter the vehicle data for the service report in this
menu.
Short selection
Free selection
Other selections
ENTER-OK
Содержание AirConServiceCenter ASC1000G
Страница 2: ......