![Wacker Neuson IREN Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/wacker-neuson/iren/iren_operators-manual_3240613022.webp)
9 Maintenance
22
100_0101_mt_0003.fm
9.3
Maintenance work
Working in the workshop
Perform maintenance work in a workshop on a workbench. This has the following
benefits:
Protection of the machine of contamination on the construction site.
A level and clean work surface makes work easier.
There is a better overview over small parts and they are not lost as easily.
Visual inspection for damage
Check all machine parts for damage.
Check the tightness of the switch diaphragm for the ON/OFF switch.
Check wear dimensions of the vibrator head
Wear dimensions:
Minimum diameter of lower tube øL
L
Minimum diameter of vibrator head øL
Length of vibrator head L
L
Wear is highest at the immersed end of the vibrator head.
Dimensions in bold are wear dimensions.
Dimensions in brackets are original dimensions of new machines.
Let the lower tube be exchanged by your Wacker Neuson contact if the wear dimen-
sions are reached at a certain point.
WARNING
A damaged machine part, protective hose or power cable can result in personal
injury caused by electric current.
Do not operate a damaged machine!
Have a damaged machine repaired immediately.
Machine
type
Dimensions for vibrator head and lower tube
[mm]
øL
L
L
L
øL
L
IREN30
28
(30)
347
(353)
— *
*
Vibrator head does not comprise 2 parts.
— *
IREN38
33
(38)
338
(345)
36
(38)
218
IREN45
38
(45)
372
(382)
42
(45)
333
IREN58
50
(58)
390
(400)
54
(58)
253
IREN65
52
(65)
475
(490)
58
(65)
322