4-42
OM EZ38 us 1.1 * ez38i400.fm
4
Putting the machine into operation for the first time and running-in period
Before putting the machine into operation for the first time, check it
visually for exterior damage due to transport, and check whether the
equipment supplied with the machine is complete.
• Check the fluid levels according to chapter “Maintenance”.
Each machine is correctly adjusted and checked before it is delivered.
Handle the machine carefully during its first 50 operating hours.
• Do not load a cold engine.
• Warm up the machine at low engine speed and little load, do not warm
it up at a standstill.
• Do not change engine speed abruptly.
• Avoid using the machine under heavy loads and/or at high speeds.
• Avoid abrupt acceleration, braking and changing traveling direction.
• Do not run the engine at high speed for extended periods.
• Strictly observe the maintenance plans and perform (or have
performed) the mandatory maintenance on or with the machine
see chapter “7.2 Maintenance overview” on page 7-2
.
traveling on public roads
Information
The machine is not certified for travel on public roads.
Содержание EZ38
Страница 1: ...Track Excavator EZ38 OPERATOR S MANUAL 5200016122 1 1 0814 www wackerneuson com 5 2 0 0 0 1 6 1 2 2 ...
Страница 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Страница 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Страница 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Страница 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Страница 242: ...9 22 OM EZ38 us 1 1 ez38t900 fm 9 Cabin or canopy without extra weight Cabin or canopy with extra weight ...
Страница 243: ...OM EZ38 us 1 1 ez38t900 fm 9 23 9 VDS cabin or canopy without extra weight VDS cabin or canopy with extra weight ...
Страница 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Страница 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...
Страница 248: ...9 28 OM EZ38 us 1 1 ez38t900 fm 9 Notes ...