OM EZ38 us 1.1 * ez38i400.fm
4-29
4
Job site
Height of job site
A
: 120 cm (47 in).
Figures 97 and 98 refer to work with a Wacker Neuson hydraulic hammer.
Information
Working with another attachment can modify the height of the job site.
Installing
1. A minimum 2 persons are required for installing/removing.
2. Stop and park the machine. Stop the engine. See “Preparing
lubrication”.
3. Install/remove shatter protection
A
from the front and fasten/remove it
at the fastening points
B
with the fastening material supplied.
4. Tighten screws
C
at fastening points
B
to 25 Nm (18 ft.lbs).
Fig. 97
A
Fig. 98
Fig. 99
B
B
A
Fig. 100
C
Содержание EZ38
Страница 1: ...Track Excavator EZ38 OPERATOR S MANUAL 5200016122 1 1 0814 www wackerneuson com 5 2 0 0 0 1 6 1 2 2 ...
Страница 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Страница 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Страница 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Страница 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Страница 242: ...9 22 OM EZ38 us 1 1 ez38t900 fm 9 Cabin or canopy without extra weight Cabin or canopy with extra weight ...
Страница 243: ...OM EZ38 us 1 1 ez38t900 fm 9 23 9 VDS cabin or canopy without extra weight VDS cabin or canopy with extra weight ...
Страница 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Страница 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...
Страница 248: ...9 28 OM EZ38 us 1 1 ez38t900 fm 9 Notes ...