4-30
OM EZ38 us 1.1 * ez38i400.fm
4
Checking the screw connections of the cabin
1. Raise the floor mat on the outer left side.
2. Tighten screw
A
to 85 Nm (63 ft.lbs).
3. Raise the floor mat on the outer right side.
4. Tighten lock nut
B
to 85 Nm (63 ft.lbs).
5. Tighten screw
C
to 85 Nm (63 ft.lbs).
6. Tighten screw
D
to 85 Nm (63 ft.lbs).
7. Tighten screw
E
to 85 Nm (63 ft.lbs).
8. Tighten screw
F
to 85 Nm (63 ft.lbs).
Fig. 101
A
Fig. 102
B
C
Fig. 103
D
E
Fig. 104
F
Содержание EZ38
Страница 1: ...Track Excavator EZ38 OPERATOR S MANUAL 5200016122 1 1 0814 www wackerneuson com 5 2 0 0 0 1 6 1 2 2 ...
Страница 12: ...1 6 OM EZ38 us 1 1 ez38v100 fm 1 Notes ...
Страница 38: ...3 10 OM EZ38 us 1 1 ez38e300 fm 3 Warning labels Fig 13 ...
Страница 43: ...OM EZ38 us 1 1 ez38e300 fm 3 15 3 Labels Fig 29 ...
Страница 156: ...5 60 OM EZ38 us 1 1 ez38b510 fm 5 Notes ...
Страница 242: ...9 22 OM EZ38 us 1 1 ez38t900 fm 9 Cabin or canopy without extra weight Cabin or canopy with extra weight ...
Страница 243: ...OM EZ38 us 1 1 ez38t900 fm 9 23 9 VDS cabin or canopy without extra weight VDS cabin or canopy with extra weight ...
Страница 244: ...9 24 OM EZ38 us 1 1 ez38t900 fm 9 Dimensions Overview EZ38 ...
Страница 246: ...9 26 OM EZ38 us 1 1 ez38t900 fm 9 Overview EZ38 VDS ...
Страница 248: ...9 28 OM EZ38 us 1 1 ez38t900 fm 9 Notes ...