BA E16 en* 1.0 * E16_10_510.fm
5-27
Operation 5
Hammer operation
Only hammer in the allocated work area and only with splinter protection
(canopy) or closed front plate (cabin).
– see chapter “ Shatter protection (option)” on page 4-19
The vehicle with canopy is not certified for demolition work according to
EN 474-5. A front guard cannot be attached.
WARNING
Danger of piercing/penetration by objects from the front!
Work involving risk of piercing/penetrating by objects from the front can
cause accidents with serious injury or death.
► During operation, all persons must stay clear of the job site of the vehicle.
► Do not position the vehicle under the workplace during demolition,
since debris could fall onto the vehicle.
► Observe the mandatory limits of the work area.
► Do not hammer horizontally or upward.
► Only hammer with attached shatter protection or closed front window.
WARNING
Accident hazard due to tipping over of vehicle!
A tipping vehicle can cause serious injury or death.
► During operation, all persons must stay clear of the job site of the vehicle.
► Do not perform any demolition work under the vehicle. This could
cause the vehicle to tip over.
► The vehicle can lose its balance and tip over if a hammer or other
heavy attachment is used.
► Never turn, lower or set down the attachment abruptly.
► Do not extend or retract the boom abruptly.
► Do not use the impact force of the attachment to perform demolition
work. Broken or falling pieces can cause serious injury.
► Use a hammer only at vehicle standstill.
Information
In combination with Powertilt, only use the smallest possible released
hydraulic hammer.
Содержание ET35
Страница 14: ...1 8 BA E16 en 1 0 E16_10_100 fm 1 Foreword Notes...
Страница 46: ...3 8 BA E16 en 1 0 E16_10_300 fm 3 Introduction Warning labels Fig 9 symbolic representation...
Страница 51: ...BA E16 en 1 0 E16_10_300 fm 3 13 Introduction 3 Information labels Fig 25 symbolic representation...
Страница 57: ...BA E16 en 1 0 E16_10_300 fm 3 19 Introduction 3 ANSI label option Fig 43 symbolic representation...
Страница 64: ...3 26 BA E16 en 1 0 E16_10_300 fm 3 Introduction Notes...
Страница 194: ...6 8 BA E16 en 1 0 E16_10_600 fm 6 Transportation Notes...
Страница 204: ...7 10 BA E16 en 1 0 E16_10_700 fm 7 Maintenance Boom dozer blade 2 Fig 265 1 3 2 4 7 9 8 12 13 1 5 6 9 4 2 9 10 11...
Страница 252: ...8 8 BA E16 en 1 0 E16_10_800 fm 8 Malfunctions Notes...
Страница 279: ...BA E16 en 1 0 E16_10_900 fm 9 27 Technical data 9 16 Steel track additional weight long stick VDS...
Страница 285: ...BA E16 en 1 0 E16_10_900 fm 9 33 Technical data 9 32 Steel track additional weight long stick VDS...
Страница 288: ...9 36 BA E16 en 1 0 E16_10_900 fm 9 Technical data ET35 Cabin or canopy ET35 Cabin or canopy additional weight...
Страница 289: ...BA E16 en 1 0 E16_10_900 fm 9 37 Technical data 9 ET35 Cabin or canopy VDS ET35 Cabin or canopy additional weight VDS...
Страница 290: ...9 38 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 Cabin or canopy EZ36 Cabin or canopy additional weight...
Страница 291: ...BA E16 en 1 0 E16_10_900 fm 9 39 Technical data 9 EZ36 Cabin or canopy VDS EZ36 Cabin or canopy additional weight VDS...
Страница 292: ...9 40 BA E16 en 1 0 E16_10_900 fm 9 Technical data 9 15 Dimensions ET35 symbolic representation...
Страница 294: ...9 42 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 symbolic representation...
Страница 296: ...9 44 BA E16 en 1 0 E16_10_900 fm 9 Technical data Notes...
Страница 300: ...S 4 BA E16 en 1 0 E16_10_3SIX fm...