4-36
BA E16 en* 1.0 * E16_10_400.fm
4 Putting into operation
4.4
Preparatory work
Important information before putting the vehicle into operation
Perform a visual check before starting work:
- There must be no leaks.
- There must be no damaged or loose parts.
- Do not allow anyone to stay in the danger zone.
Before putting the vehicle into operation, the operator must familiarize
himself with the position of the controls and instruments.
Only operate the vehicle from the seat with the seat belt fastened.
Before using the vehicle in work operation for the first time, Wacker
Neuson recommends trying out the vehicle on open ground without any
obstacles.
When using the vehicle, check the surroundings constantly in order to
identify potential hazards in time.
Before starting work, ensure that all visual aids are clean, functional and
adjusted in accordance with the instructions in this Operator’s Manual.
The operator must follow the national and regional regulations.
Perform a
functional check of the control lever base
.
Perform a
functional check of the safe load indicator
.
Do not make any modifications that impair visibility. The vehicle does not
meet the requirements for conformity and registration.
Observe the safety instructions
– see chapter “2.4 Operation” on
.
Содержание ET35
Страница 14: ...1 8 BA E16 en 1 0 E16_10_100 fm 1 Foreword Notes...
Страница 46: ...3 8 BA E16 en 1 0 E16_10_300 fm 3 Introduction Warning labels Fig 9 symbolic representation...
Страница 51: ...BA E16 en 1 0 E16_10_300 fm 3 13 Introduction 3 Information labels Fig 25 symbolic representation...
Страница 57: ...BA E16 en 1 0 E16_10_300 fm 3 19 Introduction 3 ANSI label option Fig 43 symbolic representation...
Страница 64: ...3 26 BA E16 en 1 0 E16_10_300 fm 3 Introduction Notes...
Страница 194: ...6 8 BA E16 en 1 0 E16_10_600 fm 6 Transportation Notes...
Страница 204: ...7 10 BA E16 en 1 0 E16_10_700 fm 7 Maintenance Boom dozer blade 2 Fig 265 1 3 2 4 7 9 8 12 13 1 5 6 9 4 2 9 10 11...
Страница 252: ...8 8 BA E16 en 1 0 E16_10_800 fm 8 Malfunctions Notes...
Страница 279: ...BA E16 en 1 0 E16_10_900 fm 9 27 Technical data 9 16 Steel track additional weight long stick VDS...
Страница 285: ...BA E16 en 1 0 E16_10_900 fm 9 33 Technical data 9 32 Steel track additional weight long stick VDS...
Страница 288: ...9 36 BA E16 en 1 0 E16_10_900 fm 9 Technical data ET35 Cabin or canopy ET35 Cabin or canopy additional weight...
Страница 289: ...BA E16 en 1 0 E16_10_900 fm 9 37 Technical data 9 ET35 Cabin or canopy VDS ET35 Cabin or canopy additional weight VDS...
Страница 290: ...9 38 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 Cabin or canopy EZ36 Cabin or canopy additional weight...
Страница 291: ...BA E16 en 1 0 E16_10_900 fm 9 39 Technical data 9 EZ36 Cabin or canopy VDS EZ36 Cabin or canopy additional weight VDS...
Страница 292: ...9 40 BA E16 en 1 0 E16_10_900 fm 9 Technical data 9 15 Dimensions ET35 symbolic representation...
Страница 294: ...9 42 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 symbolic representation...
Страница 296: ...9 44 BA E16 en 1 0 E16_10_900 fm 9 Technical data Notes...
Страница 300: ...S 4 BA E16 en 1 0 E16_10_3SIX fm...