BA E16 en* 1.0 * E16_10_710.fm
7-49
Maintenance 7
Tightening the tracks
1. Park the vehicle on firm, level, and horizontal ground.
2. Raise the vehicle evenly and horizontally by means of the boom and
stabilizer blade.
3. Stop the engine.
4. Operate the control lever repeatedly to release the pressure in the
hydraulic system.
5. Pump grease with a grease gun through lubricating valve
D
.
6. Start the engine.
7. Lower the vehicle to the ground.
8. In order to check that the tension is correct:
- Let it run at idling speed without any load
- Slowly move the vehicle forward and reverse and switch it off again.
9. Check the track tension again.
➥
If it is not correct:
10.Repeat steps 2–9. Contact a Wacker Neuson service center if track
tension still is too low after pumping in more grease.
Reducing tension
1. Place a suitable container underneath to collect the grease.
2. Slowly turn lubricating valve
D
a maximum of one revolution
anticlockwise to release the grease.
➥
The grease flows out of the groove of the lubricating valve.
3. Re-tighten lubricating valve
D
.
4. In order to check that the tension is correct:
- Lower the vehicle to the ground,
- Start the engine,
- Let it run at idling speed without any load, then slowly move the
vehicle forward and reverse, then turn it off again. Raise the vehicle
again by means of the boom and stabilizer blade.
5. Check the track tension again.
➥
If it is not correct:
6. Adjust again.
Environment
Use a suitable container to collect fluids and lubricants as they flow out
and dispose of them in an environmentally friendly manner.
Fig. 301
D
Fig. 302
D
Содержание ET35
Страница 14: ...1 8 BA E16 en 1 0 E16_10_100 fm 1 Foreword Notes...
Страница 46: ...3 8 BA E16 en 1 0 E16_10_300 fm 3 Introduction Warning labels Fig 9 symbolic representation...
Страница 51: ...BA E16 en 1 0 E16_10_300 fm 3 13 Introduction 3 Information labels Fig 25 symbolic representation...
Страница 57: ...BA E16 en 1 0 E16_10_300 fm 3 19 Introduction 3 ANSI label option Fig 43 symbolic representation...
Страница 64: ...3 26 BA E16 en 1 0 E16_10_300 fm 3 Introduction Notes...
Страница 194: ...6 8 BA E16 en 1 0 E16_10_600 fm 6 Transportation Notes...
Страница 204: ...7 10 BA E16 en 1 0 E16_10_700 fm 7 Maintenance Boom dozer blade 2 Fig 265 1 3 2 4 7 9 8 12 13 1 5 6 9 4 2 9 10 11...
Страница 252: ...8 8 BA E16 en 1 0 E16_10_800 fm 8 Malfunctions Notes...
Страница 279: ...BA E16 en 1 0 E16_10_900 fm 9 27 Technical data 9 16 Steel track additional weight long stick VDS...
Страница 285: ...BA E16 en 1 0 E16_10_900 fm 9 33 Technical data 9 32 Steel track additional weight long stick VDS...
Страница 288: ...9 36 BA E16 en 1 0 E16_10_900 fm 9 Technical data ET35 Cabin or canopy ET35 Cabin or canopy additional weight...
Страница 289: ...BA E16 en 1 0 E16_10_900 fm 9 37 Technical data 9 ET35 Cabin or canopy VDS ET35 Cabin or canopy additional weight VDS...
Страница 290: ...9 38 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 Cabin or canopy EZ36 Cabin or canopy additional weight...
Страница 291: ...BA E16 en 1 0 E16_10_900 fm 9 39 Technical data 9 EZ36 Cabin or canopy VDS EZ36 Cabin or canopy additional weight VDS...
Страница 292: ...9 40 BA E16 en 1 0 E16_10_900 fm 9 Technical data 9 15 Dimensions ET35 symbolic representation...
Страница 294: ...9 42 BA E16 en 1 0 E16_10_900 fm 9 Technical data EZ36 symbolic representation...
Страница 296: ...9 44 BA E16 en 1 0 E16_10_900 fm 9 Technical data Notes...
Страница 300: ...S 4 BA E16 en 1 0 E16_10_3SIX fm...