![Wacker Neuson ET16 Скачать руководство пользователя страница 138](http://html1.mh-extra.com/html/wacker-neuson/et16/et16_operators-manual_3133362138.webp)
5-36
BA ET16 de* 1.0 * et16b510.fm
5 Operation
1. Move the attachment inward completely and position it at 5–10 cm (2–
4 in) above the ground.
2. Unlock switch
D
and press it to position
1
.
➥
The quickhitch is enabled and the buzzer sounds.
3. Press and hold the foot-operated touch button
E
and at the same time
pull back the
J
dozer blade lever.
➥
The quickhitch opens.
➥
Check pin
F
must be fully extended.
4. Retract the bucket cylinder.
➥
The attachment is lowered to the ground.
Fig. 165
D
1
Fig. 166
E
J
Fig. 167
F
Fig. 168
Содержание ET16
Страница 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Страница 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Страница 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Страница 84: ...4 24 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Cabin overview 2 11 13 7 10 1 12 5 8 16 14 15 4 6 9 3...
Страница 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Страница 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Страница 177: ...BA ET16 de 1 0 et16w700 fm 7 9 Maintenance 7 Lubrication plan 10 1 2 2 3 8 Fig 211 3 7 5 11 11 11 7 5 9 4 4 1 6...
Страница 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Страница 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...
Страница 246: ...S 4 BA ET16 de 1 0 et16en1_0SIX fm Index...