BA ET16 de* 1.0 * et16i400.fm
4-31
Putting into operation 4
Check lists
The checklists below assist you in checking and monitoring the machine
before, during, and after operation.
Wacker Neuson does not claim those lists to be exhaustive.
If the answer to one of the questions is
No
, first rectify the cause of the
fault (or have it rectified) before starting work.
The checking and monitoring work listed below is described in greater
detail in the following chapters.
Start-up checklist
Check and observe the following points before putting the machine into
operation or starting the engine:
No.
Question
Page
1
Enough fuel in the tank?
2
Water in water separator and fuel filter checked and
drained if necessary?
3
Correct engine oil level?
4
Coolant level OK?
5
Correct oil level in the hydraulic oil
reservoir?
6
Glass cleaner in washer reservoir?
7
Lubrication points greased?
8
Tracks checked for cracks, cuts, etc.?
--
9
Light system, mirrors, signaling, warning and indicator
lights operational and/or adjusted correctly?
--
10
Windows, mirrors, lights, steps, all pedals and control
levers clean?
--
11
All control levers and pedals in neutral position?
--
12
Does the window washing system function correctly?
13
Control lever base raised?
14
Are other persons required to guide you?
--
15
Attachment safely locked?
16
Engine cover locked?
Filler cap closed tightly?
17
Tools and other loose objects removed?
--
18
Seating position adjusted correctly?
19
Are all visual aids functional, clean and adjusted cor-
rectly?
20
Seat belt fastened?
Содержание ET16
Страница 6: ...EG 2 BA ET16 de 1 0 et16konf fm Declaration of conformity Notes...
Страница 36: ...2 22 BA ET16 de 1 0 Safety_01_0 fm 2 Safety Notes...
Страница 45: ...BA ET16 de 1 0 et16e300 fm 3 9 Introduction 3 Warning labels...
Страница 49: ...BA ET16 de 1 0 et16e300 fm 3 13 Introduction 3 Labels...
Страница 54: ...3 18 BA ET16 de 1 0 et16e300 fm 3 Introduction ANSI label option...
Страница 84: ...4 24 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Cabin overview 2 11 13 7 10 1 12 5 8 16 14 15 4 6 9 3...
Страница 102: ...4 42 BA ET16 de 1 0 et16i400 fm 4 Putting into operation Notes...
Страница 160: ...5 58 BA ET16 de 1 0 et16b510 fm 5 Operation Notes...
Страница 177: ...BA ET16 de 1 0 et16w700 fm 7 9 Maintenance 7 Lubrication plan 10 1 2 2 3 8 Fig 211 3 7 5 11 11 11 7 5 9 4 4 1 6...
Страница 218: ...8 4 BA ET16 de 1 0 et16b800 fm 8 Malfunctions Notes...
Страница 242: ...9 24 BA ET16 de 1 0 et16t900 fm 9 Technical data Notes...
Страница 246: ...S 4 BA ET16 de 1 0 et16en1_0SIX fm Index...