![Wacker Neuson CRT 48-31V Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/wacker-neuson/crt-48-31v/crt-48-31v_operators-manual_3128572026.webp)
Operation
CRT 48-31V
wc_tx000141gb.fm
24
4.9
Pitch Adjustment
See Graphic: wc_gr000147
When changing or setting the pitch (angle) of the trowel blades, slow
the machine, set the desired pitch on the left side of the machine, then
adjust the right side to match.
To
increase the
pitch, turn the pitch control inward
(a)
. Use the pitch
indicator
(b)
to adjust pitch equally on both right and left trowel blades.
Working Conditions of
Concrete
Suggested Working
Pitch
1.
Wet surface working stage
Flat (No Pitch)
2.
Wet to plastic working
stage
Slight Pitch
3.
Semi-hard working stage
Additional Pitch
4.
Hard finishing stage
(burnishing)
Maximum Pitch
5-10º
15º
0°
25°
4
3
2
1
wc_gr000147
a
b
20-25º
Содержание CRT 48-31V
Страница 1: ...Ride On Trowels CRT 48 31V OPERATOR S MANUAL 0154550en 006 1006 0 1 5 4 5 5 0 E N...
Страница 2: ......
Страница 10: ...Safety Information CRT 48 31V wc_si000049gb fm 8 2 5 Label Locations...
Страница 11: ...CRT 48 31V Safety Information wc_si000049gb fm 9...
Страница 35: ...CRT 48 31V Maintenance wc_tx000142gb fm 33...
Страница 42: ...Maintenance CRT 48 31V wc_tx000142gb fm 40 Notes...
Страница 43: ......
Страница 56: ...AEM_ConcretePowerTrowel qxd 7 23 03 6 31 AM Page 1...